Key takeaways
- The Welsh fitness regulations list 29 matters and circumstances used to judge whether a home is fit for human habitation[1].
- Each storey needs a working smoke alarm connected to the dwelling's electrical supply, and rooms with a gas appliance need a carbon monoxide alarm[1].
- A valid electrical condition report lasts 5 years, and the contract-holder must get a copy within 7 days of the occupation date[1].
- Do not run Welsh properties on English templates: the deadlines and the hazard lists differ.
How the Welsh regime differs
In Wales, rented homes are let under occupation contracts, and the landlord must keep the dwelling fit for human habitation. The Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022 set out how fitness is determined, which contracts are covered, and specific duties on alarms and electrical safety[1]. They sit alongside the licensing and registration system run by Rent Smart Wales, under which landlords who let or manage their own property and agents who let or manage for others must be licensed[2].
For agents with offices in England, the differences are practical. England has updated its Housing Health and Safety Rating System so that it now has 21 hazards rather than 29, and those updates only apply to England[3]. The Welsh schedule still lists 29 matters and circumstances[1]. Electrical report deadlines differ too: in England, existing tenants must receive the report within 28 days of the inspection[4], while the Welsh rule is 7 days from the occupation date[1].
The 29 matters and circumstances
The Schedule to the regulations lists the matters and circumstances considered when deciding whether a dwelling is fit for human habitation, from damp, mites and mould or fungal growth to structural collapse and falling elements[1]. Grouping them makes them easier to use in an inspection.
Source: legislation.gov.uk (The National Archives), 2022[1]
Show the data
| Item | Value |
|---|---|
| Pollutants and temperature | 10 |
| Space, security, light, noise | 4 |
| Hygiene, sanitation, water | 4 |
| Falls | 4 |
| Fire, electrical, other accidents | 7 |
| Group | Matters in the Schedule |
|---|---|
| Pollutants and temperature | Damp, mites and mould; cold; heat; asbestos and manufactured mineral fibres; biocides; carbon monoxide and fuel combustion products; lead; radiation; uncombusted fuel gas; volatile organic compounds |
| Space, security, light and noise | Crowding and space; entry by intruders; lighting; noise |
| Hygiene, sanitation and water | Domestic hygiene, pests and refuse; food safety; personal hygiene, sanitation and drainage; water supply |
| Falls | Falls associated with baths; falling on surfaces; falling on stairs; falling between surfaces |
| Fire, electrical and other accidents | Electrical hazards; fire; flames and hot surfaces; collision and entrapment; explosions; position and operability of amenities; structural collapse and falling elements |
Use the same groups as the headings of your Welsh inspection report. A property manager who walks through them in order will cover every matter in the Schedule and produce a report that maps directly onto the law if a contract-holder ever challenges the condition of the home.
Smoke and carbon monoxide alarms
Regulation 5 sets specific alarm requirements for the contracts it covers. On each storey of the dwelling there must be a smoke alarm in repair and proper working order and connected to the dwelling's electrical supply[1]. A carbon monoxide alarm is needed in each room containing a gas appliance, and the regulation also covers oil-fired and solid fuel burning combustion appliances[1].
- Check that smoke alarms are mains-powered, not battery-only. A battery alarm on a storey does not meet the connection requirement.
- Map every room with a gas, oil or solid fuel appliance and confirm a carbon monoxide alarm is fitted there.
- Test all alarms at the start of each occupation contract and record the result in the check-in report.
- Test again at routine visits, and replace any alarm that fails, is past its stated life or has been removed.
- Ask contract-holders to report a beeping or silent alarm straight away, and treat it as urgent.
Keep an alarm map for each property: a simple list of each storey and each room with a combustion appliance, the alarm fitted there, its power source and the date it was last tested. It turns a check-in test into a two-minute task and gives you a clear record if a contract-holder later says an alarm was missing.
Electrical safety and the 7-day rules
Regulation 6 requires a valid electrical condition report for the dwelling. A report is valid until the end of 5 years beginning with the day the inspection is carried out[1]. The deadlines for paperwork are short and are measured in days, not weeks:
At the start of occupation
Give the contract-holder a copy of the most recent electrical condition report before the end of 7 days starting with the occupation date[1].
After a new inspection during occupation
Give a copy before the end of 7 days starting with the day the inspection was completed[1].
After investigatory or remedial work
Give written confirmation of the work before the end of 7 days starting with the day the landlord received the confirmation[1].
Before the report expires
Book the next inspection well before the 5-year point so a valid report is always in place.
The regulations also include provisions on converted contracts and a transitional rule for electrical condition reports that existed before they came into force[1]. If you manage older tenancies that converted to occupation contracts, check how those provisions apply to each property.
Seasonal checks: cold, heat and damp
Three of the Schedule's matters are seasonal: cold, heat, and damp, mites and mould or fungal growth[1]. They generate a large share of contract-holder complaints and are easier to prevent than to fix in the middle of a cold snap or a heatwave.
- Early autumn: confirm boilers have been serviced, heating controls work and radiators heat fully. Check extractor fans and trickle vents before condensation season.
- Winter: respond to heating failures as emergencies, and to reports of mould with a visit rather than a leaflet.
- Late spring: check top-floor and south-facing flats for overheating risk, such as windows that cannot open safely or no shading.
- All year: record each check on the property file so you can show the pattern if a complaint is made.
Agree the seasonal schedule with landlords at instruction, including who pays for servicing and minor ventilation improvements, so the property manager can act without seeking approval each time.
An inspection routine for Welsh lets
- Before the visit, check the electrical report date, the alarm records from the last visit and any open repairs.
- Walk the property group by group: pollutants and temperature, space and security, hygiene and water, falls, then fire and electrical.
- Test every smoke and carbon monoxide alarm and note its location and power source.
- Photograph any issue against the Schedule matter it relates to, such as damp and mould or falling on stairs.
- Ask the contract-holder whether anything has stopped working or worried them since the last visit.
- Send the landlord a report within two working days with actions graded urgent, soon or monitor.
Example (fictional): at a routine visit to a terrace in Swansea, a property manager finds a battery smoke alarm on the top floor because the mains-wired unit had been removed during redecoration. She records it under fire, tells the landlord the same day that it does not meet the connection requirement, and books an electrician. The alarm is replaced within the week and the check is recorded on the property file.
Writing Welsh duties into your terms
Management agreements written for England often miss Welsh specifics. Review your Welsh terms against the regulations and make the split of duties explicit: who arranges and pays for electrical condition reports, who supplies and tests alarms, who gives copies to the contract-holder within the 7-day windows, and what the agent may instruct without approval when a matter in the Schedule is found. Add the landlord's registration and your licence number, and a clause confirming the landlord will not carry out licensable letting or management work themselves unless they hold a licence. A clear table of duties prevents the most common dispute: each side assuming the other had arranged the inspection.
When a home may be unfit
If an inspection or a contract-holder report suggests one of the 29 matters is serious enough to make the home unfit, act as though it is until you know otherwise. Tell the landlord in writing, recommend an inspection by a suitable contractor, and set a date for the work. Where the problem affects safety, such as missing alarms, exposed wiring or a failed heating system in winter, push for action within days rather than weeks.
Keep your advice in writing. If a landlord refuses or delays work on a matter in the Schedule, your file should show what you found, what you advised and when.
Rents in Wales are lower than in England, with an average of £848 a month in September 2026[5], and landlords sometimes resist spending on compliance. Present the cost against the alternative: a home that cannot lawfully be occupied earns nothing, and a licence condition breach can put the landlord's or agent's licence at risk.
Frequently asked questions
Do smoke alarms have to be mains-wired in Wales?
For contracts covered by regulation 5, each storey needs a smoke alarm in proper working order and connected to the dwelling's electrical supply[1].
How quickly must a Welsh contract-holder receive the electrical report?
Before the end of 7 days starting with the occupation date, and within 7 days of any new inspection being completed[1].
References
legislation.gov.uk (The National Archives) (2022). The Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022 (opens in a new tab) ↑
Rent Smart Wales (Welsh Government scheme) (2026). Welcome to Rent Smart Wales (opens in a new tab) ↑
GOV.UK (2026). Landlord and agent guide to the Housing Health and Safety Rating System (HHSRS) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑
Office for National Statistics (2026). Private rent and house prices, UK: October 2026 (opens in a new tab) ↑