Key takeaways
- Planning permission and building regulations approval are separate; a sale can be missing either or both.
- In England, the planning enforcement window is now 10 years for building works substantially completed on or after 25 April 2024[1].
- The time limit for a notice requiring removal or alteration of non-compliant building work in England became 10 years[2].
- Indemnity insurance covers enforcement risk, not safety; regularisation is the route when buyers or lenders need proof the work is sound.
- Ask about every alteration at the valuation, not after the buyer's solicitor does.
Two kinds of approval, often confused
Sellers often say an extension 'has planning' as if that settles it. Planning permission decides whether a development is acceptable in principle: its size, appearance and use. Building regulations approval decides whether the work was built safely: structure, fire safety, drainage, insulation and ventilation. Many alterations need building regulations approval but not planning permission, and some need both.
Proof of building regulations compliance usually takes one of two forms: a completion certificate from the local authority or an approved inspector, or a certificate from a competent person scheme for work such as replacement windows, boilers and electrical installations. When neither can be found, the buyer's solicitor will raise it, and the sale can stall for weeks.
These gaps are common partly because sellers are rarely asked early. A poll cited by the government found that no more than 2% of home movers felt they had enough information before making an offer[3], and 79% of responses to the government's consultation backed mandatory upfront information[4].
Enforcement time limits have changed
The usual argument for doing nothing about old works has been that the council can no longer take action. That argument has weakened in England.
- Planning: for building or engineering works, and changes of use to a single dwelling, the old four-year enforcement limit has been replaced by a single ten-year period for all breaches. It applies where the work was substantially completed on or after 25 April 2024[1]. Older works keep the earlier limit.
- Building regulations: the Building Safety Act 2022 changed the time limit for a notice requiring removal or alteration of non-compliant work under section 36 of the Building Act 1984 from 12 months to 10 years[2]. The section was fully in force in England from 1 October 2023, and in Wales for its remaining purposes from 1 July 2026[2].
Source: GOV.UK, 2024[1]
Show the data
| Item | Value |
|---|---|
| Works substantially completed before 25 April 2024 | 4 years |
| Works substantially completed on or after 25 April 2024 | 10 years |
Longer windows mean recent unauthorised works stay exposed to enforcement for much longer, which affects whether indemnity insurance is available, what it costs and whether a buyer's lender will accept it. How the limits apply to a particular piece of work is a question for the conveyancer.
Indemnity, regularisation or retrospective planning
| Situation | Usual route | Why |
|---|---|---|
| Certificate exists but is lost | Copy from the council or the competent person scheme | Quickest and cleanest; often available online |
| Old work, no sign of problems, buyer and lender relaxed | Indemnity insurance | Covers the cost of enforcement action; quick to arrange |
| Recent work still within an enforcement window | Regularisation or indemnity, depending on the buyer and lender | Enforcement risk is real; buyers may want proof |
| Structural work, loft conversion or anything with safety concerns | Regularisation certificate from the council | Insurance does not make the work safe |
| Works that needed planning permission and did not have it | Retrospective planning application or lawful development certificate | Settles the planning position for future sales |
| Buyer has a survey raising concerns about the work | Specialist inspection and regularisation | The buyer's concern is safety, not enforcement |
Indemnity policies have a well-known limitation: they usually stop covering the risk if anyone contacts the council about the works. Sellers should therefore take advice from their solicitor before approaching the local authority, and buyers should understand what the policy does and does not cover.
What indemnity insurance does not do
- It does not confirm the work meets building regulations.
- It does not cover the cost of putting defects right if the work is unsafe; it covers losses from enforcement action.
- It may not satisfy a buyer's surveyor, or a lender that has its own concerns.
- It may be void if the council is contacted about the works before the policy is in place.
- It does not settle the position for the next sale; the next buyer may ask the same questions.
Indemnity is a tool for the legal risk of enforcement. When the real question is whether a beam is strong enough, only an inspection answers it.
Handling it at instruction
Ask about every alteration
At the valuation, walk through the property and ask about extensions, lofts, removed walls, new windows, boilers, rewiring, bathrooms in new places and outbuildings. Note dates as best the seller knows them.
Ask for the paperwork
Request completion certificates, competent person certificates and planning decisions for each item. Many can be found on the council's online records.
Flag gaps to the seller's solicitor
List the missing items and ask the solicitor to recommend a route before marketing. Warn the seller not to contact the council without advice.
Describe the property accurately
If a room's status is uncertain, such as a loft room without a completion certificate, describe it carefully. Material information must not mislead.
Prepare the explanation
Put a short summary in the sales pack: what was done, what paperwork exists and what the seller proposes, so the buyer's solicitor sees the answer with the question.
Where to look for proof
Before assuming a certificate is missing, check the obvious sources. Many apparent gaps close within a day once someone looks in the right place.
- Local authority building control records, often searchable online by address, which show applications and completion certificates.
- The planning portal or the council's planning search for permissions and conditions.
- Competent person scheme registers for replacement windows and doors, gas boilers and electrical work; installers registered with schemes such as FENSA, Gas Safe or NICEIC notify the council and issue certificates.
- The seller's own paperwork from when they bought: their purchase solicitor may hold copies of certificates supplied at the time.
- Warranty providers for newer homes, who hold build warranty and completion documents.
Ask the seller to search before marketing. A copy certificate obtained in the first week costs far less in time than an indemnity debate in week ten.
Scotland and Wales
Scotland uses a different system. Building work there needs a building warrant before it starts and a completion certificate accepted by the council afterwards, and missing paperwork is usually resolved through a late completion certificate application or, for older work, a letter of comfort from the council. The Home Report should flag alterations, so Scottish agents often see the issue earlier.
Wales follows the same broad approach as England for building regulations and planning, but rules and commencement dates can differ, as the different start dates for the building regulations time limit show. Check the Welsh position with the conveyancer rather than assuming the English rules apply.
Talking to buyers about it
Buyers hear 'missing certificate' and imagine the worst. A calm, specific explanation helps.
Script: 'The seller replaced the windows a few years ago and can't find the certificate. Their solicitor has suggested an indemnity policy, which is common for this kind of work, and your solicitor will explain what it covers. If you'd prefer the seller to try to get a copy certificate first, let me know and I'll ask.'
For structural work, set expectations differently: 'The loft room was built without a final building control sign-off. The seller has applied for a regularisation certificate, and the council's inspection is booked. We'll share the outcome with your solicitor as soon as we have it.'
Costs and timing to plan for
Each route has a different timetable, and sellers should know which one they are on before a buyer is found. A copy certificate can sometimes be downloaded the same day. An indemnity policy can usually be arranged within days once the solicitor has the details. A regularisation application involves an application, an inspection and possibly opening up work, and can take weeks or longer. A retrospective planning application follows the council's normal planning timetable.
Tell the seller which route their solicitor has chosen and add the expected date to the progression plan. If regularisation is under way when a buyer offers, explain the timetable to the buyer at the offer stage rather than letting it surface in the solicitor's report.
Example: a kitchen wall that came down
Example (fictional). During a valuation, the seller mentions that the wall between kitchen and dining room was removed by a previous owner. There is no structural engineer's report and no completion certificate. The agent notes it and asks the seller's solicitor for advice before launch.
Example, continued. The solicitor advises that because the work is structural, an indemnity policy would not answer a buyer's real question. The seller commissions an engineer's inspection and applies for regularisation. The particulars describe the open-plan room and note that a regularisation application is in progress. When an offer arrives, the buyer's solicitor receives the engineer's report and the council's acknowledgement with the draft contract, and the issue never becomes a reason to renegotiate.
Frequently asked questions
Can I sell a house without building regulations approval?
Yes, but the buyer's solicitor will ask about it. Common routes are a copy certificate, indemnity insurance, a regularisation certificate or, for planning breaches, a retrospective application.
What is a regularisation certificate?
A certificate from the local authority confirming that unauthorised building work meets the regulations, after an inspection. It may require opening up parts of the work.
Does indemnity insurance make unauthorised work legal?
No. It covers losses from enforcement action by the council. It does not confirm the work is safe or compliant, and it may be void if the council is contacted first.
How long can a council take enforcement action?
In England, planning enforcement is now generally 10 years for works substantially completed on or after 25 April 2024, and the building regulations notice limit is 10 years. The conveyancer will check how the limits apply.
References
GOV.UK (2024). Enforcement appeals: key changes under the Levelling-up and Regeneration Act (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (2022). Building Safety Act 2022, section 39 (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Home buying and selling reform (consultation) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Home buying and selling reform roadmap (opens in a new tab) ↑