Key takeaways
- Voids averaged almost four weeks among Propertymark letting agents in August 2026, so every day saved in the turnaround is valuable[1].
- Order matters: trades that disturb the property first, safety checks next, cleaning after trades, inventory and photos last.
- Renew any certificate that would expire early in the next tenancy while the home is empty and access is easy.
- New tenants must receive the gas record and electrical report before they move in, and alarms must work on day one[2][3][4].
Why the void is the best time for safety work
An empty property is the one moment you do not need to negotiate access, rearrange a tenant's day or work around furniture. It is also when the landlord is earning nothing, so every task needs to be sequenced to avoid waiting. The average void period reported by Propertymark letting agents was almost four weeks in August 2026[1]. Nationally, 8% of private rented dwellings in England were vacant while awaiting another tenant or owner in 2024[5].
- Vacant awaiting tenant or owner 8%
Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2025[5]
Show the data
| Item | Value |
|---|---|
| Vacant awaiting tenant or owner | 8% |
A good void plan does two things at once: it makes sure the new tenancy starts with every safety duty met, and it shortens the time between keys out and keys in. The two goals support each other, because the biggest delays in a void are usually the same missing certificates or late trades that create compliance risk.
Decide the scope on the day of check-out
The void plan starts at the check-out, not after it. Before the outgoing tenant leaves, or on the day itself, the property manager should know the answers to five questions.
- Which certificates will expire within the first months of the next tenancy? Renew those now.
- What damage or wear has the check-out identified, and which trades are needed?
- Are there any open repairs or hazards from the last tenancy that were waiting for vacant possession?
- Does the landlord want improvements, such as redecoration, new flooring or energy upgrades?
- When is the earliest realistic move-in date, given contractor availability?
Get landlord approval for the full scope in one message, with quotes, rather than drip-feeding requests over three weeks. A landlord who approves everything on day one saves a week.
Agree a void budget ceiling with each managed landlord at instruction. If the scope from the check-out falls inside it and covers only safety work and like-for-like repairs, the property manager can instruct immediately and report afterwards. Anything above the ceiling, or any improvement, needs a written approval. That one rule removes most of the waiting time at the start of a void.
The right order of works
Day 0 to 1: secure and record
Take meter readings, change or re-code locks if needed, photograph the condition and start the deposit process with the check-out report.
Days 1 to 5: disruptive trades
Plumbing, electrical alterations, damp treatment, joinery and anything that creates dust or opens walls. These go first because everything after them would need redoing.
Days 3 to 7: safety checks
Gas safety check, electrical inspection if due, and repairs from either. Book them after disruptive trades that could affect the installations, not before.
Days 5 to 9: decoration and flooring
Paint and floors after trades and safety repairs, so new finishes are not damaged.
Days 8 to 10: alarms and final checks
Fit or test smoke and carbon monoxide alarms, check windows, locks, extractor fans and heating controls.
Days 9 to 11: professional clean
Clean once, after all trades. A clean before the electrician arrives is a wasted clean.
Days 10 to 12: inventory and photos
Inventory and marketing photos last, when the property looks as the tenant will receive it.
Marketing can start before the works finish if you have good photos from before the last tenancy, but only when you are confident of the move-in date. In England, agents will in future need to confirm that the landlord and property are registered before marketing a let and show the registration numbers on adverts[6]; build that check into the step before marketing goes live.
The safety checks in detail
Each safety duty has its own rule about the new tenant. Get them right in the void and the move-in is simple.
- Gas: each appliance and flue must have been checked within the last 12 months, and a new tenant must receive a copy of the last record before they occupy the property[2].
- Electrical: a copy of the electrical safety report must be supplied to a new tenant before they occupy the premises[3]. If the report is close to its five-year limit, renew it now.
- Alarms: a smoke alarm on each storey used as living accommodation and a carbon monoxide alarm in any room with a fixed combustion appliance other than a gas cooker, each in proper working order on the day the tenancy begins[4].
- EPC: an EPC is valid for 10 years[7]. Check the expiry date and the rating before marketing, and arrange a new assessment if needed.
- Water: run all taps and showers after a long void, and clean shower heads, to reduce the risk from stagnant water.
- Furniture: in furnished lets, check permanent fire labels on upholstered items before the inventory.
Energy upgrades while the home is empty
Voids are also the cheapest time to improve energy performance. Private rented homes in England and Wales must currently meet a minimum energy efficiency standard of EPC band E[8], and landlords who are close to the line, or planning ahead for tougher standards, can use the empty weeks for loft insulation, heating controls, draught-proofing or a boiler replacement. These jobs are disruptive with a tenant in place and straightforward without one.
If the landlord agrees to an upgrade, book the EPC assessment after the work, not before, so the new certificate reflects the improvement. Sequence it with the other trades: insulation and heating before decoration, and the assessor's visit before the final clean.
Preparing the incoming tenant
The last part of the void is handover. A tenant who understands the home on day one reports fewer avoidable faults in the first month and is less likely to complain that something was never explained.
- Send the safety documents with the move-in confirmation, so they arrive before occupation and you have a dated record.
- Show the tenant how to test alarms, where the stopcock and fuse board are, and how the heating controls and extractor fans work.
- Explain how to report repairs, what counts as an emergency and the out-of-hours number.
- Record the handover in the check-in report, including the alarm test and meter readings, and ask the tenant to sign or acknowledge it.
Example: a twelve-day turnaround
| Day | Task | Owner |
|---|---|---|
| 0 | Check-out, meter readings, photos, scope agreed with landlord | Property manager |
| 1 | Plumber repairs leaking bath trap; electrician replaces damaged socket | Contractors |
| 3 | Gas safety check (due in two months, renewed now) | Gas engineer |
| 4 | Decorator starts on hallway and bedroom | Decorator |
| 7 | Carpet fitted in bedroom | Flooring contractor |
| 8 | Alarms tested, extractor fan cleaned, heating checked | Property manager |
| 9 | Professional clean | Cleaner |
| 10 | Inventory and photos | Inventory clerk |
| 12 | Move-in with gas record, electrical report, EPC and alarm test recorded | Property manager |
Example (fictional): in this plan the gas check was not due for another two months, but renewing it in the void avoided arranging access during the new tenant's first weeks. The new tenancy starts with a full year on the gas record and no early-tenancy appointments.
Common causes of slow voids
- Landlord approvals requested piecemeal rather than in one decision.
- Contractors booked in the wrong order, so work has to be redone.
- A certificate found to be missing on the day before move-in.
- Keys not available to contractors, or a single key set shared between trades.
- Cleaning booked before the final trade, so the property is cleaned twice.
- No one owning the void: the property manager assumes the contractor is chasing, and the contractor assumes the opposite.
Give every void a named owner and a daily check of the plan, even if it is a two-minute look at the calendar. Most lost days come from tasks that nobody noticed had stalled.
Measuring void performance
Track three numbers per branch: days from check-out to works complete, days from works complete to move-in, and the number of voids where a safety document was missing at the point of marketing. The first tells you about contractors, the second about lettings demand and pricing, and the third about compliance discipline. Share them with landlords at annual review; a landlord who can see that your voids are short and safe is less likely to shop around.
Use the same data to plan ahead. If certain months bring a cluster of check-outs, pre-book contractor capacity for those weeks and line up a cleaner and inventory clerk before the notices arrive.
Frequently asked questions
Should a gas check be done during a void?
If the current record would expire early in the new tenancy, yes. The new tenant must receive a copy of the last record before moving in, and checks must be within 12 months of the last one[2].
What must a new tenant receive before moving in?
In England, the gas safety record and the electrical safety report before occupation[2][3], with alarms in working order on the day the tenancy begins[4].
How long is a typical void?
Propertymark letting agents reported an average void period of almost four weeks in August 2026[1].
References
Propertymark (2026). Housing Insight Report: August 2026 (opens in a new tab) ↑
legislation.gov.uk (The National Archives) (1998). The Gas Safety (Installation and Use) Regulations 1998, regulation 36 (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑
GOV.UK (2022). The Smoke and Carbon Monoxide Alarm (England) Regulations 2015: Q&A booklet for the private rented sector (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). English Housing Survey 2024 to 2025: introduction and key findings (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Register your rental property service: guidance for letting agents and property managers (opens in a new tab) ↑
GOV.UK (2026). Selling a home: Energy Performance Certificates (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Domestic private rented property: minimum energy efficiency standard - landlord guidance (opens in a new tab) ↑