Landlord approval limits for repairs: setting and using them

How to set repair approval limits in letting agent terms of business, which jobs bypass them, and how to handle emergencies above the limit.

Ava research teamPublished 6 min read

On this page
  1. What an approval limit is for
  2. Setting the limit
  3. Jobs that bypass the limit
  4. Emergencies above the limit
  5. Holding a repair float
  6. Example: a burst pipe on a Saturday
  7. Handling refusals and slow replies
  8. Overseas and portfolio landlords
  9. Planning for larger works
  10. A script for setting limits at instruction
  11. Frequently asked questions
  12. References

Key takeaways

  • An approval limit lets the property manager instruct work up to a set amount without asking first; set it per landlord in the terms of business.
  • The Property Ombudsman's England code expects terms to explain repair and emergency procedures, and accepts that agents sometimes act as an agent of necessity[1].
  • Statutory and safety work should be authorised in advance whatever its cost, with the landlord told immediately.
  • Plan now for larger approvals: private rentals are expected to reach EPC C by 1 October 2030, with a proposed spending cap of £10,000[2].

What an approval limit is for

Every managed landlord needs to answer one question at instruction: how much can the agent spend on a repair without asking? Without a limit, every dripping tap becomes an email chain and every emergency becomes a judgement call made at night. With a clear limit, the property manager instructs routine work immediately, asks before anything larger, and knows exactly what to do when something serious happens out of hours.

The Property Ombudsman's England code expects your terms of business to explain the service level and, where applicable, the repair, emergency and arrears procedures[1]. The approval limit is the centre of those procedures. Delays caused by slow approvals also feed the most common complaint: poor, unclear or delayed communication was the first issue in ombudsman lettings disputes in 2025[3].

Setting the limit

There is no correct figure. The right limit depends on the landlord's attitude to cost, the property's age and value, and how quickly the landlord replies. Offer a default and let landlords choose.

Approval limit options to offer in terms of business
TierSuitsWhat it means in practice
Low limitCost-conscious landlords who reply quicklyMost jobs need approval; slower but tightly controlled
Standard limitMost landlordsRoutine repairs go ahead; larger jobs need a quote and approval
High limitPortfolio and overseas landlords, or those who reply slowlyMost jobs go ahead; only major works need approval
Per-job-type limitsLandlords with specific preferencesDifferent limits for plumbing, heating, appliances, decoration
  • State whether the limit includes VAT and whether it applies per job or per visit.
  • Say what happens if a job reveals more work: the contractor stops and calls, and the new total needs approval if it exceeds the limit.
  • Set a reply deadline for approvals, such as two working days, and say what you will do if there is no reply.
  • Review the limit at each annual landlord review and whenever costs change significantly.

Jobs that bypass the limit

Some work should never wait for an approval email. Put a standing authority in the terms for safety and statutory work, whatever the cost, with a duty to tell the landlord immediately.

  • Making safe after a gas escape, electrical danger or major leak.
  • Securing the property after a break-in or a failed external door.
  • Restoring heating or hot water where a household is vulnerable or the weather is cold.
  • Renewing gas safety records, electrical reports and alarms on time.
  • Electrical remedial work identified in a safety report, which must be completed within 28 days or any shorter period specified[4].
  • Work required by a council notice within the notice period.

Make the standing authority conditional on reasonable cost and on informing the landlord the same day. Landlords accept emergency spending far more readily when they hear about it promptly from you rather than from their statement.

Emergencies above the limit

The code accepts that there will be times when an agent has to act as an agent of necessity[1], for example when urgent action is needed to protect people or property and the landlord cannot be reached. Write a short procedure so staff know when they may rely on it.

  1. Make safe first

    Instruct the minimum work needed to remove the immediate danger or prevent further damage, not the full repair.

  2. Try to reach the landlord

    Call, then message, then email, using every contact on file. Record each attempt with the time.

  3. Decide and record

    If the landlord cannot be reached and waiting would put people or the property at risk, authorise the make-safe work and write down why.

  4. Report the same day

    Tell the landlord what happened, what was done, the cost so far and the options for the full repair.

  5. Approve the rest normally

    The permanent repair goes back through the usual approval route.

Holding a repair float

An approval limit is only useful if there is money to pay for the work. If rent has already been paid out to the landlord, an emergency plumber's invoice can leave the client account short for that landlord. Agree a retained float in the terms: a sum kept back from rent on each property to cover approved and emergency repairs, topped up from the next rent receipt.

  • Set the float at or slightly above the approval limit so routine jobs can be paid without waiting for the next rent.
  • Show the float as a separate line on every statement so the landlord can see it is their money held for them.
  • Ask the landlord to fund larger approved works in advance, rather than letting the account go overdrawn.
  • Return the float when the management ends, less any outstanding invoices.

Example: a burst pipe on a Saturday

Example (fictional): at 9pm on a Saturday a tenant reports water pouring through the kitchen ceiling from the bathroom above. The landlord's approval limit is £300 and the landlord is on a flight. The on-call manager instructs an emergency plumber to isolate and repair the pipe and a drying company to set up dehumidifiers, a combined cost of about £650. She records three attempts to reach the landlord, the reason for acting, and the photos. On Sunday morning she emails the landlord a summary and a quote for the ceiling repair, which waits for approval. The landlord replies on Monday thanking the team, and the ceiling is approved the same day.

Handling refusals and slow replies

When a landlord refuses or ignores a request for work that affects safety or their repairing obligations, put your advice in writing, explain the risks plainly, and record their response. If they still refuse, escalate to a director and decide whether you can continue managing the property. For non-urgent work, tell the tenant honestly that you are waiting for the landlord's decision. Landlords are already under pressure: in 2024, 31% planned to reduce their portfolio within two years[5]. Some will resist spending on homes they intend to sell. Your file should show that you advised correctly whatever they decided.

Overseas and portfolio landlords

Landlords who live abroad or own many properties often prefer higher limits and fewer questions, but they also need more structured reporting. Offer them a monthly summary of all work instructed under the limit, with photos and invoices, so they can see the pattern without approving each job. For overseas landlords, agree in advance which time zone you will call in and who in the UK, such as a relative or an accountant, can approve urgent work if they cannot be reached.

Planning for larger works

Approval limits are designed for repairs, but bigger decisions are coming. Under current minimum energy efficiency rules, landlords are not required to spend more than £3,500 including VAT on improvements[6]. The government requires privately rented homes to reach an EPC rating of C by 1 October 2030 unless a valid exemption applies, and has cut the proposed landlord spending cap for those upgrades from £15,000 to £10,000[2].

Proposed landlord spending cap for EPC upgrades
Proposed landlord spending cap for EPC upgradesComparison. Earlier proposal: £15,000; Revised cap: £10,000.£15,000Earlier proposalEarlier proposal: £15,000£10,000Revised capRevised cap: £10,000Proposed landlord spending cap for EPC upgradesComparison. Earlier proposal: £15,000; Revised cap: £10,000.£15,000Earlier proposalEarlier proposal: £15,000£10,000Revised capRevised cap: £10,000

Source: Propertymark, 2026[2]

Show the data
ItemValue
Earlier proposal£15,000
Revised cap£10,000

Works on that scale will not fit any approval limit. Treat them as projects: survey each property's EPC position, give landlords a costed plan, agree a timetable that uses voids where possible, and get approval for the programme as a whole rather than job by job. Starting early gives landlords time to budget and avoids a rush of contractors in 2029 and 2030.

A script for setting limits at instruction

  1. "Most landlords set a repair limit so we can fix small things straight away. Our standard is [amount] per job. Would you like that, or a different figure?"
  2. "Safety work and emergencies are different: we'll always act to make the home safe and call you immediately."
  3. "For anything above the limit we'll send you a quote and photos and ask for a reply within two working days."
  4. "If we can't reach you in an emergency, we'll do only what's needed to make it safe and tell you the same day."

Frequently asked questions

What is a repair approval limit?

The amount a letting agent may spend on a repair without asking the landlord first, set in the terms of business.

Can a letting agent carry out emergency repairs without approval?

Agents sometimes have to act as an agent of necessity[1]. Agree in the terms what emergency work can go ahead, do only what is needed to make safe and tell the landlord the same day.

How much will landlords need to spend on EPC upgrades?

Current rules cap required spending at £3,500 including VAT[6]; the proposed cap for reaching EPC C by 2030 is £10,000[2].

References

  1. The Property Ombudsman (2026). Code of Practice for Residential Letting Agents (England), effective 1 May 2026 (opens in a new tab) ↑

  2. Propertymark (2026). Energy reforms bring tougher penalties for landlords and new support for property upgrades (opens in a new tab) ↑

  3. The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑

  4. Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑

  5. Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Private Landlord Survey 2024: main report (opens in a new tab) ↑

  6. Department for Energy Security and Net Zero (GOV.UK) (2026). Domestic private rented property: minimum energy efficiency standard - landlord guidance (opens in a new tab) ↑