Key takeaways
- Councils no longer need Secretary of State confirmation for selective licensing schemes of any size, so expect more of them[1].
- Councils must consult for at least 10 weeks before a designation, which gives agents time to prepare landlords[1].
- A designation can last up to 5 years; diarise the start, end and any renewal consultation[1].
- Rent repayment orders for housing offences are doubling to a maximum of 24 months' rent under the Renters' Rights Act[2].
Why selective licensing is now a monitoring job
Selective licensing lets a council require a licence for privately rented homes in a designated area, whether or not they are HMOs. It catches ordinary family lets, flats and single-occupant homes that no national rule would touch. For agents, that means a property can need a licence simply because of where it is.
The rules have loosened for councils. Since 23 December 2024, councils are no longer required to obtain confirmation from the Secretary of State before introducing a scheme, of any size[1]. They must still meet the statutory requirements and are expected to consult for at least 10 weeks[1]. The likely result is more schemes, larger schemes and more frequent changes. An agency that checked its patch two years ago cannot rely on that check today.
What makes an area eligible
The government guide lists the conditions a council must consider before designating an area: low housing demand, a significant and persistent problem with anti-social behaviour, poor housing conditions, high levels of migration, a high level of deprivation, or high levels of crime[1]. Councils also look at the size of the private rented sector, and the guide says an area with more than 19% of homes privately rented can be considered to have a high proportion[1].
That threshold is close to the national picture. In 2024-25, 19% of households in England rented privately; in London the share was 28%, down from 32% the year before[3]. Many urban wards are well above the line, which is why schemes tend to appear in cities and large towns. Do not assume a rural or suburban patch is safe, though: councils can designate areas for poor housing conditions or anti-social behaviour as well, and a single estate or a handful of streets can be enough for a scheme.
Tracking designations across your patch
List every council you let in
Include neighbouring councils where you take the odd instruction. One missed authority is enough to cause a problem.
Bookmark each council's licensing page
Most councils publish current schemes, maps, start and end dates and fees. Record the page address for each.
Watch for consultations
Because councils must consult for at least 10 weeks[1], a consultation is your early warning. Subscribe to council consultation alerts where available.
Check quarterly
Once a quarter, review each council's page and note any new, extended or ending schemes on a single tracker.
Map your stock
Match every managed and let-only property to the tracker and flag any in a current or proposed designation.
Act on changes
When a new scheme is confirmed, write to affected landlords the same week with the start date, the application route and what you will do.
Before marketing any let
Make the licensing check a gate at instruction, alongside the EPC, gas record and electrical report. The check takes minutes when the tracker is up to date.
- Is the address inside a current selective or additional licensing designation?
- If yes, is there a licence on the council's public register, and who holds it?
- Does the licence cover the planned number of occupiers and the property as it is now?
- When does the licence expire, and does it run beyond the planned tenancy?
- Have the licence conditions been read and added to the property file?
- Is the landlord registered on the new rental property register where required? Agents will in future need to confirm registration before marketing and show registration numbers on adverts[4].
If the answer to the second question is no, the property should not be let until an application has been made. Some councils treat a duly made application as a defence for the period while it is considered, but check the council's own wording before relying on it.
Supporting the application
Landlords often ask the agent to help, and a well-prepared application moves faster. Most councils ask for similar evidence.
| Item | Where it usually comes from | Agent's role |
|---|---|---|
| Proposed licence holder and manager details | Landlord and agency | Confirm who holds and who manages |
| Gas safety record | Engineer | Supply the current record |
| Electrical installation condition report | Electrician | Supply the current report |
| Smoke and carbon monoxide alarm details | Check-in report | Confirm locations and test dates |
| Tenancy agreement template | Agency | Supply the current template |
| Fit and proper person declarations | Licence holder and manager | Help the landlord complete them |
| Floor plan or room list | Agency or landlord | Provide from marketing materials |
Councils check that the licence holder and manager are fit and proper, just as they do for HMO licences[5]. If the agency is named as manager, its own compliance record becomes part of the decision.
The cost of getting it wrong
Letting an unlicensed home in a selective licensing area is an offence. Councils can prosecute or impose civil penalties, and tenants can apply for a rent repayment order for some housing offences. The government's guide to the Renters' Rights Act says the maximum amount a landlord can be ordered to repay will double from 12 to 24 months' rent, and that councils can impose civil penalties of up to £40,000 for serious, persistent or repeat non-compliance[2].
Example: a landlord's house in a new selective licensing area is let by an agency on a let-only basis, and nobody notices the scheme started four months earlier. A council officer finds the property unlicensed during a street survey. The landlord applies straight away, but the council issues a penalty, the tenants seek a rent repayment order, and the landlord asks why the agency's instruction check did not pick it up. A quarterly tracker would have flagged the consultation months before the scheme began.
Putting it in the terms of business
Licensing duties fall on the person having control of the property and the person managing it, which can include the agent. Make the split explicit so that nobody assumes the other party is watching the council website.
- For fully managed lets, state that the agency monitors designations and will tell the landlord about schemes affecting the property, and say whether the agency prepares applications.
- For let-only services, state that the agency checks licensing before marketing, and that keeping the licence in place afterwards is the landlord's responsibility.
- Require landlords to tell you about any change in occupiers, use or layout that could affect licensing.
- Reserve the right to stop marketing or managing a property that needs a licence but has none.
Gaps that cause most licensing failures
- A council boundary runs down the middle of a road, and the tracker assumes both sides are in the same scheme.
- A scheme is renewed with a different map, and properties that were outside are now inside.
- A property changes from a family let to sharers, moving it from selective to HMO licensing.
- The landlord sells, and the buyer assumes the licence transfers with the property.
- The licence names a manager who has left the agency.
Each of these is easy to catch with a quarterly review of the tracker against the property list. Put a named person in charge of that review, and record the date it was done.
Keeping landlords informed
Most landlords only hear about a scheme when their agent tells them. Write to affected landlords at three points: when a consultation opens, when a scheme is confirmed, and two months before it starts. Keep each message short: what the scheme is, whether their property is inside it, what they need to do, by when, and what you can do for them.
Example message: The council has confirmed a selective licensing scheme covering your property's street, starting on 1 March. Every privately rented home in the area will need a licence. We can prepare the application with you using the safety records we already hold. Please reply by 31 January so we can submit in good time.
For mandatory and additional HMO licensing, read HMO licensing: mandatory, additional and selective. For the agency's own compliance memberships, see client money protection and redress schemes.
Frequently asked questions
Does selective licensing apply to HMOs as well?
HMOs that need a mandatory or additional HMO licence are licensed under those schemes instead. Selective licensing covers other privately rented homes in the designated area.
Can a landlord let the property while a licence application is pending?
Many councils accept that a duly made application protects the landlord while it is considered, but this depends on the circumstances. Check the council's guidance and make sure the application is complete before relying on it.
How long does a selective licence last?
Licences generally last up to five years, and a designation can be made for up to five years. If a scheme ends, licences granted under it may end with it, so check the council's terms.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). Selective licensing in the private rented sector: a guide for local authorities (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Guide to the Renters' Rights Act (full guide) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). English Housing Survey 2024 to 2025: introduction and key findings (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Register your rental property service: guidance for letting agents and property managers (opens in a new tab) ↑
GOV.UK (2026). House in multiple occupation licence (opens in a new tab) ↑