Property management

Short-term let licensing in Scotland: an agent's guide

What agents managing short lets in Scotland must check: licence types, mandatory safety conditions, listings, control areas and a compliance calendar.

Ava research teamPublished 6 min read

On this page
  1. Who holds the licence, and where the agent fits
  2. Licence types in plain terms
  3. The deadlines that shaped the market
  4. Mandatory conditions you will be asked to evidence
  5. Listings and adverts
  6. Control areas and planning
  7. Onboarding a short-let owner: the checklist
  8. Running the compliance calendar
  9. Example: taking on a city-centre flat
  10. Frequently asked questions
  11. References

Key takeaways

  • Every short-term let in Scotland needs a licence from the council, and existing hosts had to apply before 1 October 2023 to keep trading[1].
  • Mandatory conditions include an annual gas safety inspection and an electrical safety inspection at least every five years[2].
  • Every listing must show the licence number and, where required, a valid EPC rating[2].
  • Registration as a Scottish letting agent covers residential tenancy work; it is not a substitute for checking each host's licence[3].

Who holds the licence, and where the agent fits

Short-term let licensing in Scotland is run by local councils under the Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022. The licence attaches to the host or operator and the premises, not to the agency. If you manage holiday or short-stay lets for owners, your job is to make sure each property you market and service is licensed, that it meets the mandatory conditions, and that your own processes do not cause a breach.

That is a different regime from residential lettings. Scottish Ministers maintain a register of letting agents under section 29 of the Housing (Scotland) Act 2014[3], which governs letting agency work for residential tenancies. Many agencies do both kinds of work. Keep the two books separate in your systems, because the rules, documents and risks differ.

Never take bookings for a short let you cannot match to a current licence number. If the owner cannot give you one, treat the property as not ready to market.

Licence types in plain terms

The Order recognises four types of short-term let, and the licence must state which applies. Getting the type wrong causes problems later, because conditions and planning rules can differ.

The four short-term let licence types
Licence typeWhat it meansTypical agency involvement
Secondary lettingA property that is not the host's only or principal home, let to guestsMost managed holiday lets and city-centre flats
Home sharingGuests stay in the host's home while the host is thereRare for agencies
Home lettingThe host's own home let while the host is awayFestival and event lets, often seasonal
Home letting and home sharingA mix of the two across the yearOwners who let rooms and the whole home at different times

Secondary letting is the type most agencies manage, and it is the one most likely to need planning permission in a control area, so check it first.

The deadlines that shaped the market

The transitional rules protected hosts who were already operating before 1 October 2022, provided they applied for a licence before 1 October 2023[1]. The amendment that set the 1 October 2023 date took effect on 31 March 2023[1]. Anyone starting since then has needed a licence before operating. For an agency, that means two checks when you take on a property: does a licence exist, and does it match this owner, this address and this type of let?

Mandatory conditions you will be asked to evidence

Every licence carries mandatory conditions, and councils can add their own. The core conditions cover safety, information and insurance. As the managing agent you will usually hold the evidence, so keep it on the property file and diarise every renewal.

  • Fire safety: satisfactory equipment to detect and warn of fire and dangerous levels of carbon monoxide, and records showing upholstered furnishings and mattresses meet the furniture fire safety regulations[2].
  • Gas safety: an annual gas safety inspection of all gas pipes, flues and appliances where there is a gas supply, with no lets until any failed appliance is repaired[2].
  • Electrical safety: an electrical safety inspection by a competent person at least every five years, with an Electrical Installation Condition Report and a Portable Appliance Testing report for appliances guests can use[2].
  • Water: a legionella risk assessment, whether or not the property is on a private supply[2].
  • Occupancy: no more guests than the number stated on the licence[2].
  • Insurance: valid buildings insurance for the licence period and public liability insurance for each let[2].
Inspection intervals in the mandatory licence conditions
Inspection intervals in the mandatory licence conditionsComparison. Gas safety inspection: 12 months; Electrical safety inspection (maximum): 60 months.12 monthsGas safety inspectionGas safety inspection: 12 months60 monthsElectrical safety inspection (maximum)Electrical safety inspection (maximum): 60 monthsInspection intervals in the mandatory licence conditionsComparison. Gas safety inspection: 12 months; Electrical safety inspection (maximum): 60 months.12 monthsGas safety inspectionGas safety inspection: 12 months60 monthsElectrical safety inspection(maximum)Electrical safety inspection (maximum): 60 months

Source: legislation.gov.uk (The National Archives), 2022[2]

Show the data
ItemValue
Gas safety inspection12 months
Electrical safety inspection (maximum)60 months

Guests must also be able to see a certified copy of the licence, fire, gas and electrical safety information and details of how to call the emergency services[2]. A laminated house guide in the hallway, plus the same information in the digital welcome message, covers this neatly.

Listings and adverts

Every listing must include the licence number and, where required, a valid Energy Performance Certificate rating, and the listing must be consistent with the licence terms[2]. That last point is where agencies slip. If the licence allows six guests, the listing cannot advertise sleeping for eight with a sofa bed. If the licence is for home letting, the listing cannot present the property as available all year.

Photos and descriptions need the same discipline. Do not show a bedroom layout that no longer exists, a parking space the guest cannot use, or a hot tub that has been removed. Guests who arrive to find something different complain to the platform, and repeated complaints can attract the council's attention when the licence comes up for renewal.

  1. Build a licence field into every listing template

    Make the licence number a required field so a listing cannot be published without it.

  2. Cross-check occupancy

    Compare bedrooms, beds and maximum guests on the listing with the licence before publishing.

  3. Add the EPC rating

    Where an EPC is required, show the rating and diarise its expiry.

  4. Audit monthly

    Check every live listing across each platform against the licence register. Platforms copy text between channels and errors spread.

Control areas and planning

Councils can designate short-term let control areas. In a control area, the licence holder must make sure that either a planning application is pending or planning permission is in force where one is required[2]. In practice this mainly affects secondary letting of whole properties. Before you take on a property in a control area, ask the owner for the planning decision notice or the application reference, and keep it on file with the licence.

If an owner's planning application is refused, do not keep the property live while they decide what to do. Pause bookings, tell any guests with future stays as early as possible, and discuss the alternatives with the owner: an appeal, a move to residential letting, or a sale. Each has different timing, and the residential option brings its own registration and tenancy rules, so set realistic expectations before the owner commits.

Onboarding a short-let owner: the checklist

  1. Copy of the licence, with the type, maximum occupancy and any council-specific conditions.
  2. Planning permission or a pending application reference if the property is in a control area.
  3. Current gas safety record, EICR and PAT report, with renewal dates in your calendar.
  4. Fire and carbon monoxide alarm details and the furniture fire safety records.
  5. Legionella risk assessment.
  6. Buildings insurance schedule and confirmation of public liability cover for each let.
  7. EPC where required.
  8. The owner's instructions on who acts as day-to-day contact for the council and guests.

If any item is missing, set a date to provide it and do not publish the listing until it arrives. A property that goes live without a licence exposes the owner to enforcement and the agency to a reputational problem it cannot easily fix.

Running the compliance calendar

Short-let books have more moving parts than residential lettings: annual gas checks, five-yearly electrical inspections, licence renewals, insurance renewals and, in some cities, visitor levy duties. Edinburgh, for example, charges a 5% levy on paid overnight accommodation for stays from 24 July 2026, on the first five nights of a stay[4]. Our guide to visitor levies for agents covers the record-keeping.

Hold the calendar in the property management system rather than a spreadsheet, assign each item to a named person and review it weekly. Send owners a 60-day reminder for anything that costs them money, such as an electrical inspection, so it is booked well before the deadline.

Example: taking on a city-centre flat

Example: an owner asks a Glasgow agency to manage a two-bedroom flat already listed on two booking platforms. The agency's checks find a valid secondary letting licence for four guests, but one platform advertises sleeping for six with a sofa bed. The EICR is four and a half years old. Before taking any bookings, the agency corrects both listings to four guests, books an electrical inspection, adds the licence number to each listing and records all the dates in its calendar. The owner signs the management agreement a week later with every condition evidenced.

Owners thinking about moving between long and short lets will ask what it means for their wider portfolio. Use the yearly review in our guide to retaining landlords to have that conversation early.

Frequently asked questions

Does a letting agent need its own short-term let licence?

The licence attaches to the host or operator and the premises. The agent's job is to check each property is licensed and meets the conditions before marketing it.

What must a short-let listing in Scotland show?

The licence number and, where required, a valid EPC rating, and the listing must be consistent with the licence terms[2].

How often do gas and electrical checks happen?

Gas safety inspections are annual, and electrical safety inspections are needed at least every five years[2].

When did existing hosts have to apply?

Hosts operating before 1 October 2022 had to apply for a licence before 1 October 2023 to rely on the transitional protection[1].

References

  1. legislation.gov.uk (The National Archives) (2022). Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022, article 7: transitional provision (opens in a new tab) ↑

  2. legislation.gov.uk (The National Archives) (2022). Civic Government (Scotland) Act 1982 (Licensing of Short-term Lets) Order 2022, schedule 3: mandatory licence conditions (opens in a new tab) ↑

  3. legislation.gov.uk (The National Archives) (2014). Housing (Scotland) Act 2014, section 29: Register of letting agents (opens in a new tab) ↑

  4. The City of Edinburgh Council (2026). About the Edinburgh Visitor Levy (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo