Key takeaways
- Landlords must keep installations for heating and hot water in repair and proper working order under section 11 of the Landlord and Tenant Act 1985[1].
- Gas safety checks are due every 12 months and can be done up to two months early without losing the original deadline, so schedule them before the cold weather[2].
- Send tenants a short winter message in October: where the stopcock is, what to do about a frozen condensate pipe and how to report a fault out of hours.
- Poor or delayed communication was the first issue listed in Property Ombudsman lettings disputes in 2025, so log every heating call and update tenants the same day[3].
Why winter repair calls need a plan
A boiler that fails in July is an inconvenience. The same failure in January, with a young family or an older tenant in the property, is an urgent risk. Section 11 of the Landlord and Tenant Act 1985 requires landlords to keep installations for heating and hot water in repair and proper working order, and the government's HHSRS guide notes that the lack of a working heating system contributes to the excess cold hazard and to damp and mould[1]. Managing agents usually carry the practical side of that duty.
Tenants judge their agent on how winter goes. In England, 81% of private renters were satisfied with their accommodation in 2024-25, compared with 94% of owner occupiers[4]. Lettings disputes resolved by The Property Ombudsman rose 65% to 3,119 in 2025[3], and poor, unclear or delayed communication was listed first among the top issues in those cases[3]. Repairs are rarely the only problem in a complaint; silence about repairs often is.
Source: The Property Ombudsman, 2025[3]
Show the data
| Item | Value |
|---|---|
| Lettings disputes | 3,119 |
| Sales disputes | 2,243 |
Pre-winter checks in September and October
The cheapest winter repair is the one found in September. Build a pre-winter programme for every managed home and track it like any other compliance date.
Bring gas safety checks forward
An annual gas safety check must be carried out every 12 months by a Gas Safe registered engineer. The check can be done up to two months before the due date while keeping the original deadline, so checks due in November to January can move into the autumn[2].
Book boiler servicing separately where needed
HSE warns that an annual service should not be assumed to include the points required by a safety check, and a safety check alone is not effective maintenance[2]. Ask the engineer to do both, and record them as two items.
Look at the outside
Gutters, downpipes, external taps and exposed pipework cause many winter leaks. Ask landlords to approve clearing and lagging in October.
Label the stopcock
At every inspection or check-in, find the internal stopcock, make sure it turns and photograph it for the file.
Plan for empty homes
Agree with each landlord how void properties will be protected over winter, such as heating on a frost setting or draining down, and who will visit and how often.
The winter message to tenants
Send every tenant a short winter message in October. Keep it practical, friendly and readable on a phone. Include the property address so it does not look like spam.
- Where the stopcock is, with the photograph from your file, and how to turn it off
- What to do if the boiler stops in freezing weather: check for a frozen condensate pipe outside, and only thaw it with warm water, never boiling water or a naked flame
- Keep the heating on low if you are away for more than a day or two in cold weather
- Report any drip, damp patch or heating fault early, even if it seems small
- The out-of-hours number for emergencies, and what counts as an emergency
- How to report a non-urgent repair, and how quickly you will reply
Ask tenants to confirm they have read it. A reply saying 'thanks, got it' is useful evidence if a burst pipe in January is followed by a dispute about who knew what.
Triage heating and water calls
Not every heating call is an emergency, but every heating call needs a decision. Agree a written triage policy with landlords before winter, so the person who answers the phone does not have to guess. The response targets below are an example policy, not legal requirements.
| Situation | Priority | Example response target | Notes |
|---|---|---|---|
| Smell of gas or suspected carbon monoxide | Emergency | Tell tenant to call the gas emergency line now | Never wait for a contractor; safety first |
| Burst pipe or uncontrolled leak | Emergency | Contractor same day | Talk tenant through the stopcock on the call |
| No heating or hot water with a vulnerable occupant | Urgent | Contractor within 24 hours | Offer temporary heaters if the landlord agrees |
| No heating or hot water, no vulnerable occupant | Urgent | Contractor within 24 to 48 hours | Update the tenant daily until fixed |
| Partial heating or low pressure | Routine | Within a week | Talk tenant through repressurising if safe |
Record every call with the time, the tenant's words, the priority given and the next action. If you cannot reach a contractor, tell the tenant that, and tell them when you will call back. A tenant who knows what is happening is far less likely to complain than one who hears nothing.
Contractor and out-of-hours cover
Winter failures cluster around cold snaps, weekends and the Christmas break, exactly when contractors are hardest to reach. Agree winter cover before December.
- At least two Gas Safe registered engineers per area, with out-of-hours numbers
- A plumber who will attend leaks at weekends
- Landlord pre-approval for emergency work up to an agreed level, so you are not chasing approval at midnight
- A named member of staff on call each weekend and over the Christmas closure
- A clear rule on when to wake a landlord, and when to act and report later
The out-of-hours line must reach someone who can act or escalate. Many agencies use a staffed rota; others use a call answering service. Ava, for example, can answer tenant calls at any hour, take the details of the fault and pass urgent ones to the person on call, but whatever you use, test the route before the first frost.
Keep records that protect everyone
Complaints that reach redress are expensive in time and money. The Property Ombudsman's average award in lettings cases was £497 in 2025[3]. Good records rarely cost anything and make most disputes short.
- Gas safety records kept for two years, with copies given to existing tenants within 28 days of the check[2]
- Every repair report logged with date, time and channel, including texts and messaging apps
- Contractor attendance times and job sheets attached to the property record
- Messages to tenants saved, not just sent
The landlord conversation about winter
Winter is the season when landlords feel the cost of an old boiler or a poorly insulated flat, and it is a good time to talk about longer-term fixes. Bring evidence rather than opinions: the number of heating call-outs in the last two winters, the age of the boiler, any damp reports and the property's energy rating.
Energy efficiency is part of the same conversation. Private rented homes in England and Wales must currently meet a minimum EPC rating of band E[7], and under the current rules landlords are not required to spend more than £3,500 including VAT on improvements[7]. The government requires privately rented homes to reach EPC band C by 1 October 2030 unless a valid exemption applies[8]. Insulation, heating controls and a modern boiler can reduce call-outs, help prevent frozen pipes and condensation, and move a property towards that target at the same time.
- Summarise last winter's heating and leak call-outs for each property, with dates and costs
- Flag older boilers, and any with repeated faults, for a replacement discussion with the engineer's view attached
- Show the EPC rating and the recommendations on the certificate
- Suggest a timetable for work in spring or summer, when contractors are easier to book and tenants are less affected
- Record the landlord's decision and the date, and revisit it at the next renewal
Landlords who see the pattern in writing usually make better decisions than those who only hear about problems one emergency at a time.
Example: a cold weekend in January
Example: on a Saturday evening in January, a tenant reports no heating in a two-bedroom flat. The on-call negotiator asks the triage questions: no gas smell, no leak, a baby in the household. She logs it as urgent, calls the first engineer, who is unavailable, and books the second for Sunday morning. She texts the tenant with the engineer's arrival window and tells the landlord by email.
Example: the engineer finds a frozen condensate pipe, thaws it, and fits insulation. The negotiator adds the job sheet to the file, sends the tenant the October winter message again as a reminder, and adds the property to a list for a lagging check before next winter. Total time from first call to working heating: under 16 hours.
Frequently asked questions
Who is responsible for a broken boiler in a rented home?
The landlord must keep heating and hot water installations in repair and proper working order. Where an agent manages the property, the management agreement should say who arranges repairs.
How often does a landlord need a gas safety check?
Every 12 months, by a Gas Safe registered engineer. The check can be carried out up to two months early while keeping the original deadline.
What should a tenant do if pipes freeze?
Turn off the water at the stopcock if a pipe bursts, and report it straight away. A frozen boiler condensate pipe can usually be thawed with warm, not boiling, water.
Is no heating an emergency?
It depends on the circumstances. It should be treated as urgent, and as a priority where there are vulnerable occupants or freezing weather. Agree a written triage policy with landlords.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2026). Landlord and agent guide to the Housing Health and Safety Rating System (HHSRS) (opens in a new tab) ↑
Health and Safety Executive (2026). Landlords and gas safety FAQs (opens in a new tab) ↑
The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). English Housing Survey 2024 to 2025: introduction and key findings (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑
Department for Energy Security and Net Zero (GOV.UK) (2026). Domestic private rented property: minimum energy efficiency standard - landlord guidance (opens in a new tab) ↑
Propertymark (2026). Energy reforms bring tougher penalties for landlords and new support for property upgrades (opens in a new tab) ↑