Property management

Repair response times tenants and landlords will accept

Set priority bands and target times for rental repairs, publish them in a repairs charter, and measure and explain performance to tenants and landlords.

Ava research teamPublished 6 min read

On this page
  1. Why publish response times at all
  2. A benchmark from social housing
  3. Four bands with suggested targets
  4. Legal deadlines sit above the bands
  5. Raising priority for vulnerable households
  6. When access is the problem
  7. Publishing a repairs charter
  8. Updates are part of the response
  9. Measuring and reporting performance
  10. Handling winter and other peaks
  11. Frequently asked questions
  12. References

Key takeaways

  • Publish four priority bands with a response target and a completion target for each, and apply them consistently.
  • Social landlords must make emergency hazards safe within 24 hours under Awaab's Law, a useful benchmark for private lettings even where it does not apply[1].
  • Some deadlines are legal, not service choices: electrical remedial work must be done within 28 days or sooner if the report says so[2].
  • Response time is as much about updates as attendance; delayed or unclear communication was the first issue in ombudsman lettings disputes in 2025[3].

Why publish response times at all

Most agencies have informal targets that live in the heads of their property managers. Tenants do not know them, landlords do not agree to them and nobody measures them. Publishing response times does three things: it sets expectations so tenants know when to chase, it gives landlords a standard they can see you meeting, and it gives your team a clear rule for every job.

The private rented sector starts from a weaker position on condition. In 2024, 10% of private rented homes in England had a damp problem, compared with 7% of social rented and 4% of owner-occupied homes[4]. Damp, heating and leaks are exactly the reports where a slow response turns into mould, a complaint and sometimes a council inspection.

Homes with a damp problem by tenure, England, 2024
Homes with a damp problem by tenure, England, 2024Column chart. Private rented: 10%; Social rented: 7%; Owner occupied: 4%.0%2.5%5%7.5%10%Private rented: 10%10%Private rentedSocial rented: 7%7%Social rentedOwner occupied: 4%4%Owner occupiedHomes with a damp problem by tenure, England, 2024Column chart. Private rented: 10%; Social rented: 7%; Owner occupied: 4%.0%2.5%5%7.5%10%Private rented: 10%10%PrivaterentedSocial rented: 7%7%SocialrentedOwner occupied: 4%4%Owneroccupied

Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2024-25[4]

Show the data
ItemValue
Private rented10%
Social rented7%
Owner occupied4%

A benchmark from social housing

Social landlords now work to statutory timescales for some hazards. The government's HHSRS guidance notes that, under Awaab's Law, social landlords must make emergency hazards safe within 24 hours of becoming aware of them[1]. It applies to social housing only, but private tenants and their advisers will compare. A private agency that cannot make an emergency safe within a day will struggle to defend that in a dispute.

The Property Ombudsman's England code does not set hours, but it does set principles: respond promptly and appropriately to reasonable communications, particularly about statutory repairing obligations or safety, and make provision for emergency reports outside normal working hours, dealing with them as soon as reasonably practicable[5]. Your published targets are how you show you meet those principles.

Four bands with suggested targets

Suggested priority bands and targets for an agency repairs charter
BandExamplesFirst responseTarget to make safe or complete
EmergencyGas escape, electrical danger, major leak, home cannot be secured, no heating for a vulnerable household in cold weatherWithin 1 hour, any timeMake safe within 24 hours
UrgentNo hot water, failed smoke or CO alarm, only toilet blocked, broken external door lockSame working dayComplete within 3 working days
RoutineDripping tap, faulty extractor fan, sticking window, minor leak containedWithin 1 working dayComplete within 20 working days
PlannedRedecoration, worn flooring, cosmetic itemsWithin 2 working daysSchedule with landlord, usually at next void

These targets are a starting point, not a legal standard. Adjust them for your contractor coverage and the properties you manage, then commit to them in writing. A target you meet most of the time is worth more than an ambitious one you routinely miss.

Two targets per band matter because they measure different things. First response shows the tenant has been heard and the job is moving; completion shows the problem is fixed. Teams that track only completion tend to leave tenants without contact for days while a part is on order, which is when complaints start.

Some repairs carry a statutory clock that overrides your service targets. Where an electrical safety report identifies remedial or further investigative work, it must be completed within 28 days or any shorter period stated in the report, and written confirmation sent to the tenant and the council within 28 days of completion[2]. If a council serves an HHSRS improvement notice, the notice sets the timetable, and failure to comply can bring a civil penalty of up to £40,000[1].

  • Flag any job with a statutory deadline in the job record and put that deadline, not the band target, in the due date.
  • Treat a failed or missing alarm as urgent at minimum, never routine.
  • Treat damp and mould reports as urgent for an initial inspection, even if the fix is planned work.
  • Escalate any job linked to a council notice to the lettings director the day it arrives.

Raising priority for vulnerable households

The same fault can be routine in one home and urgent in another. A broken boiler in a flat shared by three students in May is not the same as a broken boiler in a home with a newborn or an elderly tenant in January. Build a vulnerability flag into the tenant record, with consent, and let it move a job up one band automatically.

  • Ask at move-in whether anyone in the household has needs you should know about for repairs, such as health conditions affected by cold or mobility issues that make stairs or bathrooms hazardous.
  • Record only what is needed and why, and review it at each renewal.
  • Tell contractors when a household is flagged so they can plan the visit, without sharing unnecessary detail.
  • Report flagged-household performance separately in your monthly figures.

When access is the problem

Missed targets are often caused by access rather than contractors. A tenant who works shifts, a key that does not work, a dog that will not let the plumber in. Offer at least two appointment options, including one early or late slot where contractors can manage it, and confirm the day before. If the tenant misses an appointment, record it, rebook promptly and restart the target from the new date only if your charter says so. Keep the evidence: an ombudsman will want to see that delays were not of your making. For safety-critical work, follow up missed access in writing the same day, explaining why the visit matters.

Publishing a repairs charter

Put the bands in a short charter that tenants receive at move-in, landlords see in the terms of business, and anyone can find on your website. Keep it to one page.

  1. Define the bands

    Use plain examples tenants recognise, not technical categories.

  2. State the targets

    Give first response and completion targets for each band, and say what happens out of hours.

  3. Explain dependencies

    Say that some work needs landlord approval, parts or access, and that you will update the tenant if a target will be missed.

  4. Tell tenants how to report

    List the channels, the out-of-hours number and the information to include, such as photos.

  5. Agree it with landlords

    Make the charter part of the management agreement, with an approval limit so the team can act within the targets.

Updates are part of the response

Poor, unclear or delayed communication was the first issue listed in Property Ombudsman lettings disputes in 2025[3]. A repair that takes ten days with three clear updates often generates less frustration than one that takes five days in silence. Build updates into the process.

  1. Acknowledge every report with a reference number and the band you have assigned.
  2. Send the appointment details as soon as they are confirmed.
  3. If a target will be missed, tell the tenant before it passes, with the reason and a new date.
  4. When the job is done, confirm and ask the tenant to tell you if the problem returns.

Script for a missed target: "I said we'd have the extractor fan fixed by Friday. The part has been delayed, so the electrician is now booked for Tuesday morning. I'm sorry for the wait; I'll message you on Monday to confirm."

Measuring and reporting performance

Measure each band separately: share of jobs with first response within target, and share completed within target. Exclude nothing without a written reason, such as tenant refused access, and report exclusions alongside the figures. Share the monthly figures with the team and the annual figures with landlords.

Example (fictional): a branch publishes its charter in January. By March it is meeting the urgent completion target on 70% of jobs, mainly because one plumber covers the whole area. It adds a second plumber to the panel for urgent work, and by June the figure is 90%. The branch uses the improvement in its landlord reviews, and two landlords who had been considering self-management decide to stay.

Handling winter and other peaks

Response times slip in predictable periods: the first cold snap of autumn, freezing spells, heavy rain and the weeks around bank holidays. Plan for them. Ask contractors in September for their winter availability, agree priority for your emergencies, and keep a short list of backup contractors. Tell tenants before winter how to bleed radiators, keep pipes from freezing and report heating faults early. When a peak hits, apply the bands strictly so emergencies and vulnerable households come first, and send a short message to all tenants if routine work will be slower for a week or two.

Frequently asked questions

How quickly should a letting agent respond to an emergency repair?

Respond within the hour and make safe within 24 hours as a working target. Social landlords must make emergency hazards safe within 24 hours under Awaab's Law[1], which is a sensible benchmark.

Are there legal deadlines for private rented repairs?

Some. Electrical remedial work identified in a safety report must be done within 28 days or sooner if specified[2], and council notices set their own timetables.

What should a repairs charter include?

Priority bands with examples, response and completion targets, out-of-hours arrangements, how to report and what happens when a target will be missed.

References

  1. GOV.UK (2026). Landlord and agent guide to the Housing Health and Safety Rating System (HHSRS) (opens in a new tab) ↑

  2. Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑

  3. The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑

  4. Ministry of Housing, Communities and Local Government (GOV.UK) (2024-25). English Housing Survey 2024 to 2025: headline findings on housing quality and energy efficiency, chapter 1 (opens in a new tab) ↑

  5. The Property Ombudsman (2026). Code of Practice for Residential Letting Agents (England), effective 1 May 2026 (opens in a new tab) ↑

Book a demo

See Ava handle your calls.

Book a short demo. We’ll walk through your calls and workflow, and agree what Ava should take care of.

Book a demo