Property management

Maintenance reporting: from tenant call to finished job

Build one job record from a tenant's repair report to the contractor invoice and landlord sign-off, with intake questions, triage rules and closing checks.

Ava research teamPublished 6 min read

On this page
  1. Why one record matters
  2. What goes in the job record
  3. Intake: the questions to ask every time
  4. One process for every channel
  5. Triage: four priority bands
  6. From instruction to completion
  7. When the landlord will not approve
  8. Invoice and landlord sign-off
  9. Closing the loop
  10. Frequently asked questions
  11. References

Key takeaways

  • Every repair should live in one job record from first report to landlord sign-off, so anyone can see its status without asking.
  • Ask the same intake questions every time; good triage at the first call saves a wasted contractor visit.
  • The Property Ombudsman's England code expects provision for out-of-hours emergency reports and records of repairs carried out[1].
  • Close the loop with the tenant: delayed or unclear communication was the first issue listed in ombudsman lettings disputes in 2025[2].

Why one record matters

Most repair complaints are not about the repair. They are about not knowing what is happening. A tenant reports a fault by phone, a property manager emails a contractor, the contractor texts the tenant, the landlord approves a quote by WhatsApp, and three weeks later nobody can say who did what. Private renters were already less satisfied than owners: 81% were satisfied with their accommodation in 2024-25, against 94% of owner occupiers[3]. Repairs handled badly widen that gap.

Satisfied with their accommodation, England, 2024-25
Satisfied with their accommodation, England, 2024-25Comparison. Private renters: 81%; Owner occupiers: 94%.81%Private rentersPrivate renters: 81%94%Owner occupiersOwner occupiers: 94%Satisfied with their accommodation, England, 2024-25Comparison. Private renters: 81%; Owner occupiers: 94%.81%Private rentersPrivate renters: 81%94%Owner occupiersOwner occupiers: 94%

Source: Ministry of Housing, Communities and Local Government (GOV.UK), 2025[3]

Show the data
ItemValue
Private renters81%
Owner occupiers94%

The fix is structural. Create one job record when the report arrives, attach every message, quote, photo and invoice to it, and move it through fixed stages. The Property Ombudsman's England code expects suitable records of repairs and maintenance carried out for landlords[1]. Lettings disputes resolved by the ombudsman rose 65% to 3,119 in 2025[4], and the job record is what you will rely on if one of them is yours.

What goes in the job record

Fields in a single repair job record
FieldFilled in at
Job reference, property, tenant contact and access notesReport
Description in the tenant's words, plus photos or videoReport
Priority and target dateTriage
Safety flags: gas, electrics, water, alarms, damp, securityTriage
Landlord approval needed or within agent's limitTriage
Contractor, instruction sent, urgency and scope statedInstruction
Appointment date and confirmation to tenantBooking
Outcome, photos of completed work, any follow-on workCompletion
Invoice with breakdown, matched to quoteInvoice
Landlord charged and informed; tenant confirms fixedClose

Two of these fields come straight from the ombudsman code: instructions to contractors should indicate any urgency and, within reason, the scope or scale of the works[1], and quotes, receipts and invoices should give a detailed enough breakdown to show what work was done, where and at what cost[1].

Intake: the questions to ask every time

Whoever takes the first report, whether a negotiator, a property manager or an out-of-hours service, should follow a script. It gets the information the contractor needs and spots emergencies.

  1. "Which property and room is it, and what exactly is happening?"
  2. "Is anyone at risk right now? Can you smell gas, see sparks or exposed wires, or is water coming through a ceiling or near electrics?"
  3. "Is the home secure, and do you have heating and hot water?"
  4. "When did it start, and is it getting worse?"
  5. "Can you send a photo or short video now?"
  6. "When can a contractor get in, and is there anything they should know about access, pets or children?"
  7. "I've logged this as reference [number]. You'll hear from us by [time] with the next step."

If the tenant reports a gas smell, tell them to call the gas emergency number first and keep away from the source, then log the report. Never let the intake script delay safety advice.

Out of hours, the code expects you to make provision for tenants to report emergency repairs outside normal working hours and to deal with them as soon as reasonably practicable[1]. If calls go to Ava, which logs repair reports and flags urgent ones, the recording, transcript and summary can be attached to the job record so the morning team starts from the tenant's own words.

One process for every channel

Tenants report repairs by phone, email, portal, text, WhatsApp and in person at the branch. The channel does not matter; what matters is that every report becomes a job record within the same working day. Write one rule for the team: whoever receives a report creates or updates the job record before doing anything else with it. Forwarding an email to a colleague is not logging it.

  • Phone: log during the call using the intake script, and read back the reference number.
  • Email and portal: create the record from the message and reply with the reference.
  • Messaging apps: copy the message and photos into the record; do not leave them on a personal phone.
  • Contractor reports of a new fault found on site: log as a new job linked to the original.

Triage: four priority bands

  • Emergency: danger to people or serious damage to the property, such as gas escape, electrical danger, major leak, no heating in cold weather for vulnerable occupants, or the home cannot be secured. Make safe immediately.
  • Urgent: significant loss of amenity or a safety item, such as no hot water, a failed smoke or carbon monoxide alarm, a blocked only toilet or a broken lock on an internal door.
  • Routine: faults that affect use but not safety, such as a dripping tap, a sticking window or a faulty extractor fan.
  • Planned: improvements or wear items to schedule with other work, such as redecoration or replacing worn flooring.

Some items have their own legal clock. Faulty alarms must be repaired or replaced once the landlord is informed and finds them faulty[5], and where an electrical report identifies remedial work it must be done within 28 days or any shorter period stated[6]. Put the legal deadline in the job's target date so it cannot be missed.

Our guide to repair response times sets out target times for each band and how to publish them.

From instruction to completion

  1. Approve

    If the cost is within the landlord's approval limit, instruct. If not, send the landlord the quote, the photos and your recommendation, and set a reply deadline.

  2. Instruct

    Send the contractor the job record with urgency, scope, access notes and any safety or asbestos information.

  3. Book

    The contractor confirms an appointment; the tenant receives the date and the contractor's name.

  4. Attend and report

    The contractor sends photos of the completed work and notes any further work needed.

  5. Check

    Ask the tenant to confirm the fault is fixed. For larger jobs, inspect or ask for a video walkthrough.

When the landlord will not approve

Some jobs stall because the landlord refuses or ignores a quote. Set a reply deadline in the approval request, chase once, then escalate to a phone call. If the repair relates to safety or the landlord's repairing obligations, explain the risk in writing and record the response. Where your terms allow it and the matter is urgent, use your emergency authority. For anything else, tell the tenant honestly that you are waiting for the landlord's decision and when you will update them. Leaving the tenant in silence is the outcome that most often turns a stalled repair into a complaint.

Invoice and landlord sign-off

The job is not finished until the money side is closed. Match the invoice to the quote and the completion photos before paying. Query any invoice without a breakdown of what was done, where and at what cost[1]. Post the cost to the landlord's account with the invoice attached, so the statement shows what the money bought.

Example (fictional): a tenant reports a leak under the kitchen sink on a Friday evening. The out-of-hours line logs it as urgent, and the on-call plumber isolates the supply and replaces a failed compression joint the next morning. On Monday the property manager matches the plumber's invoice to the job, adds the completion photos and posts the cost to the landlord's statement with a note. The tenant gets a message asking them to confirm the cupboard is dry, replies yes, and the job closes four days after it opened.

Closing the loop

Send the tenant a short closing message for every job: what was done, when, and how to report it if the problem returns. For recurring faults, link the new job to the old ones so the pattern is visible. Review open jobs older than their target date every week and contact each tenant affected, even when you have nothing new to say. A tenant who hears from you before they chase is far less likely to complain.

  • Measure the share of reports acknowledged the same working day.
  • Measure average days to completion by priority band.
  • Count repeat jobs for the same fault within three months.
  • Track complaints that mention repairs or communication.

Frequently asked questions

What should a letting agent ask when a tenant reports a repair?

Where and what the problem is, whether anyone is at risk, whether the home is secure with heating and hot water, when it started, a photo if possible and access details.

Do letting agents need an out-of-hours repair line?

The Property Ombudsman's England code expects provision for tenants to report emergency repairs outside normal working hours[1].

What should a contractor invoice show?

A detailed breakdown of what work was done, in which areas of the property and at what cost[1].

References

  1. The Property Ombudsman (2026). Code of Practice for Residential Letting Agents (England), effective 1 May 2026 (opens in a new tab) ↑

  2. The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑

  3. Ministry of Housing, Communities and Local Government (GOV.UK) (2025). English Housing Survey 2024 to 2025: introduction and key findings (opens in a new tab) ↑

  4. The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑

  5. GOV.UK (2022). The Smoke and Carbon Monoxide Alarm (England) Regulations 2015: Q&A booklet for the private rented sector (opens in a new tab) ↑

  6. Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑