Key takeaways
- Electrics in rented homes in England must be inspected and tested at least every 5 years by a qualified person[1].
- C2 and FI findings need remedial or investigative work within 28 days, or sooner if the report says so[1].
- Give tenants the report within 28 days of the inspection, and the council a copy within 7 days of a request[1].
- Councils can fine landlords up to £40,000 for breaching electrical safety duties[1].
What the regulations require
The Electrical Safety Standards regulations require landlords in England to have the electrical installation in a rented home inspected and tested by a qualified and competent person at regular intervals of no more than five years. The result is an Electrical Installation Condition Report, usually called an EICR. The guidance sets out what happens next: the report goes to the tenants, any required remedial work is done within a deadline, and evidence goes to the tenant and the council[1].
The rules now reach beyond the private sector. The same guidance explains that the regulations came into force for the social rented sector from 1 November 2025, with social tenancies granted from 1 December 2025 covered and earlier social tenancies following in 2026[1]. For private lets the rules have applied for several years, so councils expect every private rented home to have a current report on file.
Up to £40,000
financial penalty a council can impose for breaching electrical safety duties[1]
Reading the codes
An EICR lists observations with codes. Agents do not need to be electricians, but they do need to know which codes trigger a legal deadline.
| Code | Meaning in the guidance | Action required |
|---|---|---|
| C1 | Danger present, risk of injury | Immediate; the inspector may make it safe before leaving, then remedial work |
| C2 | Potentially dangerous | Remedial work within 28 days or sooner if specified |
| FI | Further investigation required without delay | Investigation within 28 days or sooner if specified |
| C3 | Improvement recommended | Not required by the regulations, but worth planning |
The definitions in the table follow the government guidance[1]. A report with any C1, C2 or FI is unsatisfactory until the work is done. A report with only C3 observations is satisfactory, though a landlord may still want to plan upgrades, particularly where the C3 relates to older consumer units or the absence of RCD protection on some circuits.
The deadlines, in order
The regulations create a short chain of deadlines that agents should track as one workflow.
Give existing tenants the report
Supply a copy to each existing tenant within 28 days of the inspection[1]. Prospective tenants who ask for it must receive it within 28 days of their request.
Get the remedial work done
Complete any work required by C1, C2 or FI observations within 28 days, or any shorter period the report specifies[1].
Get written confirmation
Obtain written confirmation from a qualified person that the work has been done and the installation now meets the standard.
Send the confirmation out
Supply the confirmation, with the report, to the tenant and to the local council within 28 days of completing the work[1].
Respond to council requests
If the council asks for a copy of the report, provide it within 7 days of the request[1].
Pass it to the next inspector
Keep the report and give a copy to the person doing the next inspection and test[1].
Booking inspections without gaps
Five years is long enough for a date to be forgotten, especially when portfolios change hands. Store the EICR date and expiry as fields on the property record, not the tenancy, because the report belongs to the installation. Book the next inspection 3 months before expiry, which leaves room for access problems and any remedial work before the deadline.
- Ask for the inspector's registration with a competent person scheme, or evidence of qualifications.
- Ask for the full report, not a one-page certificate.
- Check that the report covers the whole installation, including outbuildings with electrics.
- Note any limitations the inspector recorded, such as rooms they could not access.
- Diarise the next inspection date stated on the report, which may be shorter than five years.
Who arranges it: agent or landlord
As with gas safety, the duty is the landlord's, but managed lets usually pass the arranging to the agent. In 2024, 18% of landlords in England used agent management services[2]. Those landlords will expect their agent to know the EICR date, book the next one, and chase remedial work. Let-only landlords may expect the same unless your terms say otherwise. Set it out in the terms of business, and for let-only lets, confirm before marketing that a satisfactory report is in place and give it to the tenant before the tenancy begins.
Managing remedial work in 28 days
The 28-day remedial deadline is the part most likely to slip, because it depends on a contractor, a tenant and a landlord's approval.
Example: an EICR on a two-bedroom flat comes back with one C2, an earthing issue at the consumer unit, and two C3 observations. The property manager sends the report to the tenant the same day, asks the landlord to approve the quoted repair within 48 hours, and books the original contractor for day 10. The work is done, the contractor issues written confirmation, and on day 12 the agent sends the report and confirmation to the tenant and the council by email, saving both sent messages on file. The C3 items go into the landlord's planned works list for the next void.
Tenant communication matters here too. The Property Ombudsman lists poor, unclear or delayed communication first among the top issues in its lettings disputes[3]. Tell the tenant what the inspector found in plain words, what will happen, when, and whether any circuit should not be used in the meantime.
When work cannot be done in time
Sometimes the 28 days will be missed despite best efforts, usually because the tenant will not allow access or parts are delayed. Keep a dated record of every attempt and every message, tell the landlord in writing, and keep the council informed if the delay is long. A council deciding whether to take action will look at what reasonable steps were taken.
If a council considers the duties have been breached, it can serve a remedial notice and, in some cases, arrange the work itself. An appeal against a remedial notice must be made within 28 days of the day it is served[1]. Councils' wider enforcement powers have also grown: the government's guide to the Renters' Rights Act describes civil penalties of up to £40,000 for serious, persistent or repeat non-compliance with housing requirements[4].
Taking on a property from another agent or a landlord
New instructions are where expired or missing reports surface. A landlord moving from self-management may have an old report, a one-page certificate with no observations, or nothing at all. Treat the EICR as a gate at instruction, alongside the gas record and the EPC.
- Ask for the full report, not just the summary page, and read the observations.
- Check the date and the recommended next inspection date; some inspectors set a shorter interval.
- Look for unresolved C1, C2 or FI codes and ask for the written confirmation that they were fixed.
- If the report is missing, unclear or close to expiry, book a new inspection before the property is marketed.
- Record on the file what you received and what you advised the landlord.
Example: a landlord switches to the agency with a report from four and a half years ago that lists one FI and no confirmation that it was investigated. The agency advises a new inspection before the next tenancy, the landlord agrees, and the new report is satisfactory with two C3 notes. The marketing goes ahead with a clean file and a fresh five-year date.
A short checklist for every let
- A current EICR dated within five years, or sooner if the report says so.
- No outstanding C1, C2 or FI observations, or written confirmation that they were fixed.
- Report given to the tenant, with the date and method recorded.
- Next inspection date stored on the property record.
- Remedial confirmations sent to the tenant and council within 28 days of the work.
- Copies kept to hand to the next inspector.
For the other safety records every tenant should receive, read gas safety certificates: duties for agents and smoke and carbon monoxide alarm rules.
Frequently asked questions
Does a new tenancy need a new EICR?
Not if the existing report is in date and satisfactory. A new tenant must receive a copy of the current report before they move in, and the next inspection stays on the date shown on the report.
Is an EICR needed for an HMO?
Yes. The electrical safety duties apply to HMOs as well as single lets, and HMO licence conditions often require evidence of a satisfactory report. Shared areas and every unit's installation must be covered.
Can the landlord do the remedial work themselves?
Only if they are qualified and competent to do it. In practice remedial work should be done by a qualified electrician who can provide the written confirmation the regulations require.
References
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Electrical safety standards in the private and social rented sectors: guidance (full guide) (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2024). English Private Landlord Survey 2024: main report (opens in a new tab) ↑
The Property Ombudsman (2025). Annual Review 2025 (opens in a new tab) ↑
Ministry of Housing, Communities and Local Government (GOV.UK) (2025). Guide to the Renters' Rights Act (full guide) (opens in a new tab) ↑